Balcony Work

The water barely touched the balcony, but it’s clear that it was in as much need to be repaired as the floor. Here are some of the pictures from today:
Untitled

a girder beam from the wall to and a main support- steel saddle will be added to keep them from coming a part any further.

Joint- coming apart

most dramatic connection- or lack thereof.

Untitled

another shot of it- a steel c-channel will be added though out, for the main carrying beams.

Untitled

here is the angle iron added to keep the balcony attached to the wall and an LVL screwed to a beam to help with strength.

Click here for the full Flickr Set. 

Leave a Reply

Your email address will not be published. Required fields are marked *