Installing the Floor

The concrete work is done and the floor system is underway!
(The girders are 8×8, joists are 8×3, all Douglas Fir).

floor joists ready to roll

8X8 girders

beam and lolly column

beams

in process

Leave a Reply

Your email address will not be published. Required fields are marked *